Wongm's Rail Gallery » Metro Tunnel works at South Kensington

Soil nailing works underway at the down end of South Kensington station

In album: Metro Tunnel works at South Kensington

Soil nailing works underway at the down end of South Kensington station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 4 December 2017 12:17 PM
Exposure Time: 1/400 sec
Aperture Value: f/13
Viewed 360 times
(1 time this week, 6 times this month, 11 times this year)