Wongm's Rail Gallery » Metro Tunnel early works at South Kensington

Soil nailing works underway at the down end of South Kensington station

In album: Metro Tunnel early works at South Kensington

Soil nailing works underway at the down end of South Kensington station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Tuesday 23 January 2018 09:19 AM
Exposure Time: 1/250 sec
Aperture Value: f/11
Viewed 623 times
(1 time this week, 1 time this month, 2 times this year)