Wongm's Rail Gallery » Metro Tunnel ground improvement works

Surveying reflectors affixed to the suburban tracks at Lloyd Street, South Kensington

In album: Metro Tunnel ground improvement works

To ensure that the ground improvement works for the future rail tunnel doesn't disturb the existing tracks
Surveying reflectors affixed to the suburban tracks at Lloyd Street, South Kensington

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Thursday 20 September 2018 09:14 AM
Exposure Time: 1/640 sec
Aperture Value: f/9
Viewed 594 times
(1 time this week, 1 time this month, 16 times this year)