Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Temporary stairs to the west end of the Kensington Road bentonite bridge

In album: Metro Tunnel portal works at South Kensington

Temporary stairs to the west end of the Kensington Road bentonite bridge

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Wednesday 17 July 2019 17:04 PM
Exposure Time: 1/500 sec
Aperture Value: f/4
Viewed 398 times
(1 time this week, 1 time this month, 22 times this year)