Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Solar powered monitoring equipment at the South Kensington portal work site

In album: Metro Tunnel portal works at South Kensington

Solar powered monitoring equipment at the South Kensington portal work site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 20 July 2019 11:07 AM
Exposure Time: 1/1000 sec
Aperture Value: f/10
Viewed 368 times
(1 time this week, 1 time this month, 19 times this year)