Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Pumping concrete into a massive slab at the Hobsons Road bentonite facility

In album: Metro Tunnel portal works at South Kensington

Pumping concrete into a massive slab at the Hobsons Road bentonite facility

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Thursday 25 July 2019 09:58 AM
Exposure Time: 1/1000 sec
Aperture Value: f/5
Viewed 462 times
(1 time this week, 1 time this month, 22 times this year)