Wongm's Rail Gallery » Metro Tunnel works at South Kensington

Bridge in place to carry a pipe over Kensington Road to the Hobsons Road bentonite facility

In album: Metro Tunnel works at South Kensington

Bridge in place to carry a pipe over Kensington Road to the Hobsons Road bentonite facility

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 28 July 2019 15:22 PM
Exposure Time: 1/200 sec
Aperture Value: f/10
Viewed 134 times
(2 times this week, 3 times this month, 134 times this year)