Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Concrete turnout bearers stored at the South Kensington work site

In album: Metro Tunnel portal works at South Kensington

Concrete turnout bearers stored at the South Kensington work site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 21 October 2019 08:43 AM
Exposure Time: 1/1250 sec
Aperture Value: f/6.3
Viewed 377 times
(1 time this week, 2 times this month, 7 times this year)