Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Concrete turnout bearers stored at the South Kensington work site

In album: Metro Tunnel portal works at South Kensington

Concrete turnout bearers stored at the South Kensington work site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Monday 21 October 2019 08:43 AM
Exposure Time: 1/1250 sec
Aperture Value: f/6.3
Viewed 466 times
(1 time this week, 1 time this month, 26 times this year)