Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Spoil spat out by the Hobsons Road bentonite facility

In album: Metro Tunnel portal works at South Kensington

Spoil spat out by the Hobsons Road bentonite facility

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 21 October 2019 08:44 AM
Exposure Time: 1/1000 sec
Aperture Value: f/6.3
Viewed 317 times
(1 time this week, 1 time this month, 4 times this year)