Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Clearing out the spoil at the Hobsons Road bentonite facility

In album: Metro Tunnel portal works at South Kensington

Clearing out the spoil at the Hobsons Road bentonite facility

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 26 October 2019 15:54 PM
Exposure Time: 1/320 sec
Aperture Value: f/10
Viewed 338 times
(1 time this week, 1 time this month, 10 times this year)