Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Clearing out the spoil at the Hobsons Road bentonite facility

In album: Metro Tunnel portal works at South Kensington

Clearing out the spoil at the Hobsons Road bentonite facility

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Monday 16 December 2019 17:25 PM
Exposure Time: 1/640 sec
Aperture Value: f/10
Viewed 336 times
(1 time this week, 1 time this month, 7 times this year)