Wongm's Rail Gallery » Metro Tunnel works at South Kensington

Temporary struts reinforce the walls of the cut and cover decline structure

In album: Metro Tunnel works at South Kensington

Temporary struts reinforce the walls of the cut and cover decline structure

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 6 March 2020 11:37 AM
Exposure Time: 1/250 sec
Aperture Value: f/10
Viewed 137 times
(1 time this week, 3 times this month, 137 times this year)