Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

JACON Transmixer cement mixer parked at the South Kensington portal

In album: Metro Tunnel portal works at South Kensington

JACON Transmixer cement mixer parked at the South Kensington portal

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 20 August 2022 17:33 PM
Exposure Time: 1/320 sec
Aperture Value: f/11
Viewed 119 times
(1 time this week, 1 time this month, 26 times this year)