Wongm's Rail Gallery » Metro Tunnel portal works at South Kensington

Multi-service vehicle parked at the portal, waiting to be loaded with concrete slab track panels

In album: Metro Tunnel portal works at South Kensington

Multi-service vehicle parked at the portal, waiting to be loaded with concrete slab track panels

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 11 November 2022 09:50 AM
Exposure Time: 1/400 sec
Aperture Value: f/14
Viewed 121 times
(1 time this week, 1 time this month, 24 times this year)