Wongm's Rail Gallery » Metro Tunnel works at South Yarra

Metro Tunnel works at South Yarra

The eastern Metro Tunnel portal is located beside the Pakenham and Cranbourne lines at South Yarra.

New signal waiting to be commissioned at the up end of South Yarra platform 6

Ready for the upgrade of platform 5 and 6 into turnback platforms for up trains

Tuesday 22 November 2022 10:27 AM
Viewed 18 times, 18 times this year)

Reinstatement of parkland at the Siding Reserve almost completed

Metro Tunnel service facilities located beneath

Tuesday 22 November 2022 10:22 AM
Viewed 46 times, 46 times this year)

Gantry crane still in use at the South Yarra shaft

Tuesday 22 November 2022 10:21 AM
Viewed 12 times, 12 times this year)

New train stop waiting to be commissioned at the down end of South Yarra platform 5

Ready for the upgrade of platform 5 and 6 into turnback platforms for up trains

Tuesday 22 November 2022 10:19 AM
Viewed 24 times, 24 times this year)

New signal waiting to be commissioned at the up end of South Yarra platform 6

Ready for the upgrade of platform 5 and 6 into turnback platforms for up trains

Tuesday 22 November 2022 09:36 AM
Viewed 19 times, 19 times this year)

Multi-service vehicle parked at the portal, waiting to take another load of materials into the tunnel

Friday 11 November 2022 15:50 PM
Viewed 30 times, 30 times this year)

High voltage cables emerge from the Metro Tunnel equipment room near the Jam Factory

Friday 11 November 2022 10:18 AM
Viewed 17 times, 17 times this year)

Stockpiles of equipment in the Metro Tunnel portal at South Yarra

Friday 11 November 2022 10:18 AM
Viewed 17 times, 17 times this year)

Moving a cable drum into the traction power substation beneath Siding Reserve

Friday 11 November 2022 10:17 AM
Viewed 14 times, 14 times this year)

Equipment for laying concrete slab track parked in the South Yarra approach ramp

Thursday 10 November 2022 18:40 PM
Viewed 19 times, 19 times this year)

Signals F137 and co-actor F137P for down Frankston trains departing South Yarra

Thursday 10 November 2022 18:40 PM
Viewed 14 times, 14 times this year)

Gantries in place for future traction power feeders at Siding Reserve

Thursday 10 November 2022 18:40 PM
Viewed 12 times, 12 times this year)

High voltage cables emerge from the Metro Tunnel equipment rooms at Siding Reserve

Thursday 10 November 2022 18:40 PM
Viewed 11 times, 11 times this year)

Wheeled trolley and other bits and pieces parked inside the decline ramp at South Yarra

Thursday 8 September 2022 18:22 PM
Viewed 21 times, 21 times this year)

Emergency exit walkway inside the decline ramp at South Yarra

Thursday 8 September 2022 18:22 PM
Viewed 33 times
(1 time this week, 1 time this month, 33 times this year)

William Street bridge passes over the Metro Tunnel portal at South Yarra

Saturday 20 August 2022 13:38 PM
Viewed 28 times, 28 times this year)

Front end loaders and an excavator sitting at the South Yarra portal, all fitted out for handing lengths of rail

Saturday 20 August 2022 13:38 PM
Viewed 33 times
(1 time this week, 1 time this month, 33 times this year)

Front end loaders and an excavator sitting at the South Yarra portal, all fitted out for handing lengths of rail

Saturday 20 August 2022 09:46 AM
Viewed 37 times
(1 time this week, 1 time this month, 37 times this year)

Pair of TBM support vehicles parked in the decline ramp at South Yarra

Tuesday 15 February 2022 13:47 PM
Viewed 98 times, 98 times this year)

Conduit runs emerge from the Metro Tunnel equipment rooms at Siding Reserve

Tuesday 15 February 2022 09:43 AM
Viewed 84 times, 84 times this year)

Crane atop the William Street bridge lowering items into the Metro Tunnel portal at South Yarra

Tuesday 1 February 2022 12:06 PM
Viewed 96 times
(3 times this month, 96 times this year)

Looking down into the Metro Tunnel portal at South Yarra

Tuesday 1 February 2022 12:06 PM
Viewed 255 times
(1 time this week, 17 times this month, 255 times this year)

Temporary guard rails installed on the yet to be commissioned crossover at Hawksburn

The point blades have yet to be installed , so angled guard rails have been installed in their place

Tuesday 1 February 2022 11:39 AM
Viewed 93 times
(1 time this month, 93 times this year)

Yet to be commissioned crossovers between South Yarra and Hawksburn

Tuesday 1 February 2022 11:31 AM
Viewed 96 times
(2 times this month, 96 times this year)