Wongm's Rail Gallery » Metro Tunnel works at South Yarra

Trio of hi-rail fitted boom lifts waiting to work on the overhead

In album: Metro Tunnel works at South Yarra

Trio of hi-rail fitted boom lifts waiting to work on the overhead

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 23 May 2019 15:54 PM
Exposure Time: 1/125 sec
Aperture Value: f/7.1
Viewed 318 times
(2 times this week, 1 time this month, 23 times this year)