Wongm's Rail Gallery » Metro Tunnel works at South Yarra

Front end loaders and an excavator sitting at the South Yarra portal, all fitted out for handing lengths of rail

In album: Metro Tunnel works at South Yarra

Front end loaders and an excavator sitting at the South Yarra portal, all fitted out for handing lengths of rail

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Saturday 20 August 2022 09:46 AM
Exposure Time: 1/400 sec
Aperture Value: f/10
Viewed 77 times
(1 time this week, 2 times this month, 28 times this year)