Wongm's Rail Gallery » Metro Tunnel works at South Yarra

New signal waiting to be commissioned at the up end of South Yarra platform 6

In album: Metro Tunnel works at South Yarra

Ready for the upgrade of platform 5 and 6 into turnback platforms for up trains
New signal waiting to be commissioned at the up end of South Yarra platform 6

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: Tuesday 22 November 2022 09:36 AM
Exposure Time: 1/500 sec
Aperture Value: f/10
Viewed 53 times
(1 time this week, 1 time this month, 16 times this year)