Wongm's Rail Gallery » Metro Tunnel tram replacement buses

Water filled traffic barriers protect the route 58 turnback siding at Market and Flinders Street

In album: Metro Tunnel tram replacement buses

Presumably E class trams are too long to fit in the space between the crossover and Flinders Street
Water filled traffic barriers protect the route 58 turnback siding at Market and Flinders Street

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 3 December 2022 19:45 PM
Exposure Time: 1/160 sec
Aperture Value: f/6.3
Viewed 31 times
(4 times this week, 6 times this month, 31 times this year)