Wongm's Rail Gallery » Metro Tunnel works at West Footscray

Breaking up concrete stanchion bases along the future 3rd platform alignment

In album: Metro Tunnel works at West Footscray

Breaking up concrete stanchion bases along the future 3rd platform alignment

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Friday 26 April 2019 08:27 AM
Exposure Time: 1/160 sec
Aperture Value: f/7.1
Viewed 363 times
(1 time this week, 1 time this month, 11 times this year)