Wongm's Rail Gallery » Metro Tunnel works at West Footscray

New stanchions in place along the hot standby siding alignment at the down end of West Footscray

In album: Metro Tunnel works at West Footscray

New stanchions in place along the hot standby siding alignment at the down end of West Footscray

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 13 September 2019 08:34 AM
Exposure Time: 1/640 sec
Aperture Value: f/13
Viewed 376 times
(1 time this week, 7 times this month, 14 times this year)