Wongm's Rail Gallery » Metro Tunnel works at West Footscray

1.5 metre long extension at the down end of West Footscray platform 2

In album: Metro Tunnel works at West Footscray

The station was built from scratch as part of the Regional Rail Link project in 2013 - why is it too short?
1.5 metre long extension at the down end of West Footscray platform 2

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Wednesday 16 October 2019 12:17 PM
Exposure Time: 1/200 sec
Aperture Value: f/10
Viewed 355 times
(1 time this week, 1 time this month, 9 times this year)