Ballast provides as access point to the work site at West Footscray
29 September 2019 14:34 PMViewed 242 times
(2 times this week, 12 times this month, 121 times this year)
Bike path at West Footscray station temporarily closed due to works on the footbridge
29 September 2019 14:34 PMViewed 185 times
(2 times this week, 15 times this month, 72 times this year)
Bike path at West Footscray station temporarily closed due to works on the footbridge
29 September 2019 14:33 PMViewed 199 times
(3 times this week, 13 times this month, 72 times this year)
New overhead wires at West Footscray yet to be tensioned
29 September 2019 14:25 PMViewed 145 times
(4 times this week, 11 times this month, 66 times this year)
Suburban tracks removed at the up end of West Footscray to allow the installation of a new crossover
29 September 2019 14:24 PMViewed 147 times
(4 times this week, 7 times this month, 48 times this year)
Pandrol clip puller and demolition saw between jobs
29 September 2019 14:24 PMViewed 199 times
(4 times this week, 12 times this month, 82 times this year)
Temporary fishplate attached to a length of since removed rail
29 September 2019 14:24 PMViewed 127 times
(1 time this week, 8 times this month, 60 times this year)
Dump truck removes another load of old ballast from the Middle Footscray work site
29 September 2019 14:19 PMViewed 210 times
(10 times this month, 117 times this year)
Dump truck removes another load of old ballast from the Middle Footscray work site
29 September 2019 14:18 PMViewed 167 times
(2 times this week, 9 times this month, 57 times this year)
Metro Tunnel branded tilt tray truck loaded with conduit
29 September 2019 14:15 PMViewed 182 times
(4 times this week, 8 times this month, 81 times this year)
Suburban tracks removed at the up end Middle Footscray to allow the installation of a new crossover
29 September 2019 13:16 PMViewed 174 times
(3 times this week, 8 times this month, 54 times this year)
Suburban tracks removed at the up end Middle Footscray to allow the installation of a new crossover
29 September 2019 13:15 PMViewed 161 times
(3 times this week, 12 times this month, 62 times this year)
Suburban tracks removed at the up end of West Footscray to allow the installation of a new crossover
29 September 2019 13:14 PMViewed 172 times
(3 times this week, 9 times this month, 58 times this year)
Two ballast tampers and two ballast regulators stabled at the city end of the occupation at Middle Footscray
29 September 2019 13:13 PMViewed 175 times
(3 times this week, 7 times this month, 63 times this year)
Ballast pile on Sunshine Road at West Footscray
Half of the road closed off to make space for the two weeks of trackwork
26 September 2019 17:59 PMViewed 139 times
(3 times this week, 8 times this month, 57 times this year)
Front end loader unloads a Metro Tunnel branded tilt tray truck at West Footscray
25 September 2019 08:37 AMViewed 162 times
(3 times this week, 11 times this month, 68 times this year)
Hi-rail dump truck removes another load of spoil from Tottenham Yard
25 September 2019 08:36 AMViewed 161 times
(3 times this week, 12 times this month, 60 times this year)
Deliveried a hi-rail boom lift to the Tottenham Yard work site
25 September 2019 08:35 AMViewed 166 times
(3 times this week, 11 times this month, 69 times this year)
Pile of dirt between Tottenham Yard and the standard gauge main line
24 September 2019 10:58 AMViewed 169 times
(4 times this week, 11 times this month, 82 times this year)
Excavating beside the suburban tracks at West Footscray
23 September 2019 17:15 PMViewed 140 times
(3 times this week, 9 times this month, 55 times this year)
Concrete turnout bearers being assembled into a crossover on the south side of Tottenham Yard
20 September 2019 08:10 AMViewed 319 times
(3 times this week, 10 times this month, 156 times this year)
Ready for a concrete pour at the new West Footscray platform
19 September 2019 08:48 AMViewed 161 times
(3 times this week, 6 times this month, 69 times this year)
Assembling formwork on the new platform at West Footscray
19 September 2019 08:48 AMViewed 155 times
(3 times this week, 7 times this month, 66 times this year)
Concrete turnout bearers being assembled into a crossover on the north side of Tottenham Yard
17 September 2019 13:32 PMViewed 176 times
(4 times this week, 8 times this month, 79 times this year)
Viewed 2534 times (28 times this month, 105 times this year)