Wongm's Rail Gallery » Metro Trains Melbourne trackwork

Hi rail excavator and dump truck at work clearing a mud hole on the Sunbury line at Albion

In album: Metro Trains Melbourne trackwork

Hi rail excavator and dump truck at work clearing a mud hole on the Sunbury line at Albion

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 20 October 2018 15:41 PM
Exposure Time: 1/320 sec
Aperture Value: f/7.1
Viewed 447 times
(1 time this week, 1 time this month, 8 times this year)