Wongm's Rail Gallery » NSW stations and infrastructure ยป Marulan South and Peppertree Quarry

Marulan South and Peppertree Quarry

Branching from the Main South line at Medway Junction, the Medway Quarry branch serves the Boral Marulan South limestone mine and Peppertree Quarry.

Stockpiles of manufactured sand and gravel at the Peppertree Quarry

Monday 10 October 2022 4:22 PM
Viewed 36 times, 9 times this year)

Wheel wash at the Peppertree Quarry

Monday 10 October 2022 4:21 PM
Viewed 38 times, 7 times this year)

Open cut gravel pit at the Peppertree Quarry

Monday 10 October 2022 4:20 PM
Viewed 41 times, 8 times this year)

Haul truck crosses the access road to Marulan South, after dumping overburden from the Peppertree Quarry

Monday 10 October 2022 4:10 PM
Viewed 174 times
(3 times this week, 3 times this month, 48 times this year)

Train loading indicators along the Marulan South lime works siding

Monday 10 October 2022 1:12 PM
Viewed 18 times, 6 times this year)

Up end of the siding for the Marulan South lime works

Monday 10 October 2022 1:11 PM
Viewed 23 times
(1 time this week, 1 time this month, 5 times this year)

Array of conveyor belts moves gravel around Borals' Peppertree Quarry processing site

Monday 10 October 2022 1:08 PM
Viewed 22 times, 6 times this year)

Disused signal box on the mainline at Medway Junction

Monday 10 October 2022 10:48 AM
Viewed 23 times
(1 time this week, 1 time this month, 9 times this year)

Looking down on the Boral lime works at Marulan South

Sunday 9 October 2022 6:18 PM
Viewed 40 times, 7 times this year)

Looking down on the Boral lime works at Marulan South

Sunday 9 October 2022 6:17 PM
Viewed 61 times, 12 times this year)

Viewed 146 times (2 times this week, 2 times this month, 34 times this year)