Wongm's Rail Gallery » NSW stations and infrastructure ยป Marulan South and Peppertree Quarry

Train loading indicators along the Marulan South lime works siding

In album: Marulan South and Peppertree Quarry

Train loading indicators along the Marulan South lime works siding

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Monday 10 October 2022 13:12 PM
Exposure Time: 1/1000 sec
Aperture Value: f/10
Viewed 18 times
(1 time this week, 1 time this month, 6 times this year)