Wongm's Rail Gallery » Melbourne stanchions and overhead line electrification

Additional traction power cables yet to be connected at Tottenham

In album: Melbourne stanchions and overhead line electrification

Additional traction power cables yet to be connected at Tottenham

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Sunday 4 August 2019 09:49 AM
Exposure Time: 1/1000 sec
Aperture Value: f/16
Viewed 501 times
(1 time this week, 1 time this month, 23 times this year)