Wongm's Rail Gallery » Melbourne stanchions and overhead line electrification

Retrofitted galvanised steel leg fitted to a Merz stanchion at Newport

In album: Melbourne stanchions and overhead line electrification

Possibly fitted in 1995 when the standard gauge track was routed through Newport
Retrofitted galvanised steel leg fitted to a Merz stanchion at Newport

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: Sunday 31 October 2021 18:54 PM
Exposure Time: 1/320 sec
Aperture Value: f/11
Viewed 307 times
(1 time this week, 4 times this month, 21 times this year)