Wongm's Rail Gallery » Melbourne stanchions and overhead line electrification

Electrolysis drainage connection to the Sunbury line at Albion

In album: Melbourne stanchions and overhead line electrification

Electrolysis drainage connection to the Sunbury line at Albion

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Sunday 5 December 2021 10:17 AM
Exposure Time: 1/500 sec
Aperture Value: f/16
Viewed 212 times
(1 time this week, 1 time this month, 6 times this year)