Wongm's Rail Gallery » Melbourne stanchions and overhead line electrification

Electrolysis drainage connection to the Sunbury line at Albion

In album: Melbourne stanchions and overhead line electrification

Electrolysis drainage connection to the Sunbury line at Albion

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 5 December 2021 10:17 AM
Exposure Time: 1/500 sec
Aperture Value: f/16
Viewed 115 times
(3 times this week, 10 times this month, 115 times this year)