V/Line - Pacific National rescue failed a Warrnambool service, August 2006
2 August 2006
On the morning of August 02, 2006 N452 failed at Warrnambool when it was supposed to lead the up morning service, so A81 was pulled off the freight and used to rescue the train. A79 was then sent back to Warrnambool to bring the freight back that night.
V/Line hired locomotives
24 July 2006
Occasionally V/Line has motive power shortages or failures, and need to hire locomotives from other operators for use on their own trains. In the photos here it is Freight Australia / Pacific National as the hirer
Waurn Ponds cement train
27 August 2017
Since the 2000s the main cement traffic in Victoria is from the Blue Circle Southern works at Waurn Ponds, outside Geelong. The major destination of the traffic was Lyndhurst in the south-east, which last saw a train in 2009, and Mildura and Somerton which saw the cement traffic end in December 2015.