Substation 'Ba' beside the Upfield line near the route 19 terminus
Sunday 25 March 2012 11:06 AMViewed 894 times, 0 times this year)
In album: Melbourne tramway traction substations
Substation 'Ba' - another 1990s demountable installed by the PTC
Presumably commissioned around 1992-93 at the same time as other similar looking units.
Sunday 25 March 2012 11:07 AMViewed 962 times, 0 times this year)
In album: Melbourne tramway traction substations
Centrally located stanchions on the Upfield line between Batman and Merlynston stations
Uncommon in Melbourne, this arrangement was a result of track duplication works in 1959, when a new up track was added to the left of the original line
Sunday 25 March 2012 11:08 AMViewed 1924 times, 2 times this year)
In album: Melbourne stanchions and overhead line electrification
Siemens departs Batman on a down service to Upfield
Sunday 25 March 2012 11:10 AMViewed 1669 times
(1 time this week, 1 time this month, 1 time this year)
In album: Metro Trains Melbourne - Northern group
Driver's controls at the non-engine end of RM22
Sunday 25 March 2012 2:55 PMViewed 1173 times, 0 times this year)
In album: Yarra Valley Tourist Railway
Passing on the 37 mile post on the climb towards the tunnel
Sunday 25 March 2012 3:12 PMViewed 1274 times, 0 times this year)
In album: Yarra Valley Tourist Railway
Approaching the tunnel on the up
Sunday 25 March 2012 3:12 PMViewed 1498 times, 1 time this year)
In album: Yarra Valley Tourist Railway
Current end of the line at Tunnel Hill
Restoration work on the track towards Yarra Glen is well underway
Sunday 25 March 2012 3:16 PMViewed 1457 times
(1 time this week, 1 time this year)
In album: Yarra Valley Tourist Railway