Wongm's Rail Gallery » Search

Search results

62 total matches for Saturday, 4 January 2014, ordered by date.

'Butterbox' coil steel wagons sit in the sidings beside Bayview Road

4 January 2014 15:23 PM
Viewed 843 times
(1 time this week, 1 time this month, 5 times this year)

In album: Long Island steel train

Derailer protects the main line end of the BlueScope Long Island exchange sidings

4 January 2014 15:25 PM
Viewed 2349 times
(5 times this week, 4 times this month, 12 times this year)

In album: BlueScope Long Island

Entrance to the exchange sidings at Long Island

Pacific National crews need to obtain permission from BlueScope Steel to enter the yard

4 January 2014 15:25 PM
Viewed 744 times
(4 times this week, 4 times this month, 6 times this year)

In album: BlueScope Long Island

Track from the slab steel yard rejoins the main leg of the Long Island branch

4 January 2014 15:26 PM
Viewed 621 times
(2 times this week, 2 times this month, 7 times this year)

In album: BlueScope Long Island

BL34 and BL39 wait at Long Island Junction for a signal onto the main line

4 January 2014 15:41 PM
Viewed 836 times
(3 times this week, 2 times this month, 9 times this year)

In album: Long Island steel train

Drive through Myki machine!

At Tyabb station, where the car park backs onto the platform

4 January 2014 15:48 PM
Viewed 644 times
(1 time this week, 1 time this month, 5 times this year)

In album: Myki

Sprinter leads 7009 classmate 7002 into Tyabb station on the down

4 January 2014 16:03 PM
Viewed 1286 times
(2 times this week, 2 times this month, 5 times this year)

In album: Stony Point line

Disconnected loop road opposite the platform at Somerville station

4 January 2014 16:11 PM
Viewed 591 times
(1 time this week, 4 times this year)

In album: Melbourne stations and infrastructure

BL34 and BL39 pass through Somerville station with an up train

4 January 2014 16:16 PM
Viewed 765 times
(2 times this week, 1 time this month, 5 times this year)

In album: Long Island steel train

Hampton substation, commissioned in 1969 with 1,500 kW capacity

4 January 2014 17:23 PM
Viewed 604 times
(2 times this week, 2 times this month, 4 times this year)

In album: Melbourne railway traction substations

Hampton substation, brick wall around the transformer and switchgear yard

4 January 2014 17:24 PM
Viewed 771 times
(2 times this week, 2 times this month, 6 times this year)

In album: Melbourne railway traction substations

Middle Brighton substation, traction feeders to the running lines

4 January 2014 17:35 PM
Viewed 634 times, 2 times this year)

In album: Melbourne railway traction substations

Middle Brighton substation, modernised transformer and switchgear

4 January 2014 17:36 PM
Viewed 704 times
(3 times this week, 3 times this month, 5 times this year)

In album: Melbourne railway traction substations