Wongm's Rail Gallery » Recent uploads » Recent train uploads

Recent train uploads

Recent train uploads, images 145 to 168 shown on this page. Trains and railway infrastructure

Crib crossing disassembled at Loch station

13 March 2020 14:56 PM
Viewed 29 times
(29 times this month, 29 times this year)

In album: South Gippsland Railway

Rails asphalted over at the Nyora level crossing

13 March 2020 14:40 PM
Viewed 31 times
(31 times this month, 31 times this year)

In album: South Gippsland Railway

Tracks at Nyora station being slowly covered by grass

13 March 2020 14:39 PM
Viewed 26 times
(26 times this month, 26 times this year)

In album: South Gippsland Railway

Rails asphalted over at the Nyora level crossing

13 March 2020 14:39 PM
Viewed 24 times
(24 times this month, 24 times this year)

In album: South Gippsland Railway

Rails asphalted over at the Nyora level crossing

13 March 2020 14:39 PM
Viewed 25 times
(25 times this month, 25 times this year)

In album: South Gippsland Railway

Time lapse camera in place looking over the work site

13 March 2020 12:23 PM
Viewed 21 times
(21 times this month, 21 times this year)

In album: Toorak Road level crossing removal project

X'Trapolis 909M crosses Toorak Road on an up Glen Waverley service

New rail bridge spaces in place

13 March 2020 12:23 PM
Viewed 84 times
(84 times this month, 84 times this year)

In album: Metro Trains Melbourne - Burnley group

Northern approach viaduct in place

13 March 2020 12:22 PM
Viewed 24 times
(24 times this month, 24 times this year)

In album: Toorak Road level crossing removal project

Temporary pedestrian crossing in place on the west side of the level crossing

13 March 2020 12:21 PM
Viewed 20 times
(20 times this month, 20 times this year)

In album: Toorak Road level crossing removal project

Viaduct in place across Toorak Road, level crossing still in use

13 March 2020 12:19 PM
Viewed 38 times
(38 times this month, 38 times this year)

In album: Toorak Road level crossing removal project

Viaduct in place across Toorak Road, level crossing still in use

13 March 2020 12:18 PM
Viewed 29 times
(29 times this month, 29 times this year)

In album: Toorak Road level crossing removal project

Section of 'U' trough delivered by road and waiting to be lifted into place

13 March 2020 03:15 AM
Viewed 15 times
(15 times this month, 15 times this year)

In album: Toorak Road level crossing removal project

HCMT set 2 stabled beside X'Trapolis 159M at Upper Ferntree Gully

13 March 2020 02:42 AM
Viewed 22 times
(2 times this week, 22 times this month, 22 times this year)

In album: High Capacity Metro Train testing on the Belgrave line

First train of the morning now on the PIDS at Upper Ferntree Gully

They appear 120 minutes before the train is due to run

13 March 2020 02:40 AM
Viewed 23 times
(23 times this month, 23 times this year)

In album: Melbourne suburban passenger information displays

T385, P18 and power van depart Upper Ferntree Gully for the city

13 March 2020 02:39 AM
Viewed 18 times
(18 times this month, 18 times this year)

In album: High Capacity Metro Train testing on the Belgrave line

T385, P18 and power van ready to depart Upper Ferntree Gully for the city

13 March 2020 02:30 AM
Viewed 32 times
(32 times this month, 32 times this year)

In album: High Capacity Metro Train testing on the Belgrave line

Three phase power outlets fitted to power van BVDY51

13 March 2020 02:29 AM
Viewed 17 times
(17 times this month, 17 times this year)

In album: High Capacity Metro Train testing on the Belgrave line

T385, P18 and power van ready to depart Upper Ferntree Gully for the city

13 March 2020 02:29 AM
Viewed 25 times
(25 times this month, 25 times this year)

In album: High Capacity Metro Train testing on the Belgrave line

Heavy duty transition coupler attached to the front of T385 using tie-down straps

13 March 2020 02:27 AM
Viewed 27 times
(1 time this week, 27 times this month, 27 times this year)

In album: High Capacity Metro Train testing on the Belgrave line

X'Trapolis 87M and 936M stabled at Upper Ferntree Gully

13 March 2020 02:23 AM
Viewed 19 times
(19 times this month, 19 times this year)

In album: Metro Trains Melbourne - Burnley group

Patched up platform edge at Upper Ferntree Gully

13 March 2020 02:21 AM
Viewed 5 times
(5 times this month, 5 times this year)

In album: Failing rail infrastructure of Melbourne

Uncoupling T385 from the HCMT set at Upper Ferntree Gully

13 March 2020 02:09 AM
Viewed 15 times
(15 times this month, 15 times this year)

In album: High Capacity Metro Train testing on the Belgrave line

Heavy duty transition coupler attached to the front of T385 using tie-down straps

13 March 2020 02:06 AM
Viewed 35 times
(35 times this month, 35 times this year)

In album: High Capacity Metro Train testing on the Belgrave line

Tie down straps on a HCMT carriage equipment box

13 March 2020 02:05 AM
Viewed 18 times
(6 times this week, 18 times this month, 18 times this year)

In album: High Capacity Metro Train testing on the Belgrave line