Metro Tunnel works at CBD South

22 November 2022

'Town Hall' station is being constructed in the southern end of the Melbourne CBD, and will be connected to Flinders Street Station.

Metro Tunnel works at South Yarra

22 November 2022

The eastern Metro Tunnel portal is located beside the Pakenham and Cranbourne lines at South Yarra.

Metro Tunnel portal works at South Kensington

22 November 2022

The western Metro Tunnel portal is located beside the Sunbury line at South Kensington

Metro Tunnel intake substation

22 October 2022

The Metro Tunnel intake substation at North Melbourne will convert 66kV and 22kV high voltage power to lower voltages for transmission to services inside the tunnel.

Metro Tunnel works at CBD North

15 September 2022

'Library' station is being constructed in the northern end of the Melbourne CBD, and will be connected to Melbourne Central Station.

Metro Tunnel HQ

3 September 2022

'Metro Tunnel HQ' is a visitors centre at 125-133 Swanston Street, opposite Melbourne Town Hall.

Metro Tunnel works at Arden

16 May 2022

Site of a TBM launching site, 'North Melbourne' station is being constructed at the Arden urban redevelopment precinct

Metro Tunnel works at Parkville

25 April 2022

A cut and cover station is being constructed beneath Grattan Street in Parkville, to serve the University of Melbourne and Royal Melbourne Hospital precinct on Royal Parade.

Metro Tunnel open day at Arden station

27 March 2022

On Sunday 27 March 2022 the Metro Tunnel site at Arden station was opened for public tours, taking visitors down to the future station platform and completed tunnels, and up to the future station entrance.

Metro Tunnel works at Domain

22 February 2022

Site of a TBM launching site, 'Anzac' station is being constructed at Domain Interchange, beneath St Kilda Road

Metro Tunnel segment manufacturing facility

20 November 2021

The Metro Tunnel tunnel lining segment manufacturing facility is located at Ravenhall, next door to the Boral quarry and Cleanaway tip. The completed precast concrete segments are then transported by road to the Arden and Domain work sites.

Metro Tunnel works at West Footscray

26 October 2021

A third platform and turnback siding is being constructed at West Footscray as part of the Metro Tunnel, to terminate trains from the east.

Metro Tunnel rail replacement buses - Northern group

13 September 2020

Works on the Metro Tunnel portal at South Kensington and turnback platform at West Footscray have required Metro Trains services on the Sunbury and Werribee lines to be replaced by buses between North Melbourne, Sunshine and Newport, as well as V/Line services to Geelong, Ballarat and Bendigo.

Metro Tunnel rail replacement buses - Caulfield group

14 February 2020

Works on the Metro Tunnel portal at South Yarra have required Metro Trains services on the Pakenham, Cranbourne, Frankston and Sandringham lines to be replaced by buses between Parliament, Caulfield and Elsternwick, as well as V/Line services to Gippsland.

Metro Tunnel tram replacement buses

14 October 2019

Works on the Metro Tunnel at Anzac station have required Yarra Trams services on St Kilda Road to be replaced by buses, while the tram tracks are slewed around the work site.

Toorak Road West tram diversion works

14 December 2018

To make room for the Melbourne Metro station construction site at Domain Interchange, in June 2017 route 58 (formerly route 8) trams were diverted from Domain Road and Park Street to new tracks along Toorak Road West.

Metro Tunnel early works at South Kensington

27 June 2018

To make room for the western Metro Tunnel portal beside the Sunbury line at South Kensington, freight sidings at North Dynon were relocated to the south, which made room for the relocation of 220 kV high voltage transmission lines from the future rail corridor.

Metro Tunnel geotechnical investigations

18 October 2016

Preliminary geotechnical investigation work on the Melbourne Metro Rail Tunnel commenced in 2015.

Metro Tunnel ground improvement works

During 2019 ground improvement works were completed along the Metro Tunnel corridor at Lloyd Street in Kensington and beside Moonee Ponds Creek, injecting grout into the soil to ensure that cross passages CP02, CP03 and CP04 could be safely excavated without surface movement or groundwater ingress.