Wongm's Rail Gallery » Search

Search results

78 total matches for suburban - 78 albums and 0 images, ordered by date.

Regional Rail Link rail replacement buses

24 April 2014

For two weeks in July 2011 the railway between Footscray and Sunshine will be closed to allow the first stage of Regional Rail Link works to proceed. Metro's Sydenham line service will be replaced by a bus service between Albion Station and Flemington Racecourse - by the looks of the bus interchanges, this will not be the only series of disruptions.

Farewell Hitachi Train Tour, April 2014

12 April 2014

On April 12, 2014 the Elecrail division of Steamrail ran a Farewell Hitachi Train Tour around the Melbourne suburbs with 288M-1979T-287M + 274M-1909T-273M. Starting at Craigieburn, the tour headed into the city via the Northern Loop, out to South Morang via the Clifton Hill Loop, then out to Sunbury and back via the Northern Loop, then finally back to Craigieburn.

Steamrail - Suburban Rambler, April 2014

6 April 2014

On April 6, 2014 Steamrail took diesel Y164 and steam Y112 for a trip around the Melbourne suburbs

Metro Trains Melbourne despatch paddles

13 March 2014

In 2010 Metro Trains Melbourne introduced 'despatch paddles' - an illuminated beacon for station staff to use to indicate to drivers that the platform was clear for departure. The idea was abandoned by 2012 or so, following the removal of platform staff from many locations

Mitcham level crossing removal project

7 January 2014

In 2013-2014 two level crossings at Mitcham were removed from the Lilydale / Belgrave line, when the railway line was lowered beneath Rooks Road and Mitcham Road, with the station at Mitcham also having to be rebuilt.

Blackout at Newmarket railway station, September 2013

26 September 2013

On September 26, 2013 a tree took out the mains power supply to Newmarket station, plunging the platforms into darkness, but not affecting traction power to trains or signalling systems.

Steamrail - Snow Train, July 2013

21 July 2013

R761 and R707 lead a 14 car long train from Southern Cross to Traralgon and return, having to run from Newport to Southern Cross via Sunshine and Deer Park due to Regional Rail Link works.

Metro Trains Melbourne stuffups, April 2013

26 April 2013

Over five days over the Anzac Day break there was a shutdown for Regional Rail Link related works at Viaduct Junction. April 26 was a normal workday but with limited platforms available at Southern Cross Station, resulting in all kinds of delays.

Cardinia Road station construction

25 August 2012

A new railway station on the Pakenham line between Officer and Pakenham stations

VICERS vigilance control system

16 April 2012

In 2006 the installation of the Vigilance, Control and Event Recording System (VICERS) commenced on all suburban electric trains in Melbourne. Originally due to be completed by 2010, it took until 2012 for the system to finally be tested and commissioned.

Lynbrook station construction

14 January 2012

A new railway station on the Cranbourne line between Dandenong and Merinda Park.

Metro Trains Melbourne driver training, February 2011

3 February 2011

T376 and T369 ran around the network late at night in order to train El Zorro diesel crews on the Flemington Racecourse, Craigieburn and Williamstown lines.

X'Trapolis test run to Craigieburn, January 2011

21 January 2011

After the last train on 19 January 2011, set 33M-34M + 35M-36M headed slowly to Craigieburn in order to clear the route for X'Trapolis trains.

Steamrail - Glen Waverley shuttles, June 2010

26 June 2010

On Sunday 27th June 2010 Steamrail operated steam shuttles between Darling and Glen Waverley to marks 80 years rail services to Glen Waverley. However due to an occupation on the line between the city and Newport, the train was stabled at South Dynon for a few days before the trip itself.

Craigieburn collision, May 2010

5 May 2010

Down Craigieburn service with 570M-T-M + 309M-T-M ran up the back of the down empty Apex train which was stopped at a signal outside Craigieburn station. 570M-T-M received most of the damage and needed to be cut apart; 309M-T-M was shunted off by T402 and taken to Broadmeadows as a complete train.

Metro Trains Melbourne launch

30 November 2009

X'Trapolis 863M-1632T-864M-897M-1649T-898M was stickered into the new 'Metro' livery for the first day. Held on platform 1 at Flinders Street Station, Premier John Brumby and Transport Minister Lynne Kosky were in attendance, along with MTM management. The train left late because the media were interviewing the politicians, but they ended up being left behind.

Connex Melbourne

28 November 2009

Connex Melbourne was the operator of suburban trains in Melbourne from 1999 until 2009, using a variety of EMUs ranging from the ageing Hitachi, through to refurbished Comengs, and modern X'Trapolis and Siemens models.

Connex Melbourne trackwork and works trains

24 November 2009

Trackwork and works trains on the Connex Melbourne suburban network

Comeng transfer, October 2009

28 October 2009

T357 took a Comeng EMU set from Newport Workshops to the UGR workshops at Ballarat. The set was 575M-1138T-576M + 404M-1018T-403M, the ZVDY power van was not needed but went along for the ride so T357 could bring an X'Trapolis train back

Connex - Damaged pantograph and overhead, April 2009

25 April 2009

Comeng 532M-T-531M + 542M-T-M (the prototype seating set) became dewired from the overhead on the up side of South Kensington, destroying all 4 pantographs and pulling down a fair chunk of overhead. Passengers from the rear set had to be detrained via the tracks. An N class later picked up the damaged train.

Hitachi transfer, January 2009

18 January 2009

El Zorro took CFCLA liveried T369 out light engine from Dynon to Ballarat to pick up a refurbished Hitachi set from Alstom's North Ballarat Workshops. The set was 23M-2007T-233M + 9M-1919T-144M and was taken to Newport Workshops

Hitachi transfer with T378 to Ballarat, August 2008

31 August 2008

SRHC's T378 took Elecrail Hitachi set 7M-1994T-225M-89M-1946T-99M from Newport to Ballarat Workshops via North Geelong for refurbishment. Here are some shots between Lara and Warrenheip.

Rock throwing media conference

16 October 2007

On 16 October 2007 Connex Melbourne and V/Line management held a media conference at Flinders Street Station to address the spate of rock throwing indicdents endangering their trains.

Melbourne by night

25 January 2007

A look at Melbourne after the trains stop running...

Return of the Bendigo Hitachis, August 2006

31 August 2006

After their withdrawal from suburban service in Melbourne, in February 2004 four 3-car Hitachi sets were transferred to the Bendigo North Workshops and stored unsecured in the open. In 2006 stripped of parts, and with broken windows and covered with graffiti, they were moved back to Melbourne by El Zorro using Y145 and S302 in the middle of the night of August 30th. Here they are upon arrival the next morning at Newport Workshops.

4Ds last run, March 2006

29 March 2006

The double deck 4D train had a difficult career, failing often and being an orphan in the fleet, and by 2003 it was in storage at Newport. By 2006 it reached the end of the line being stripped for parts. This was definitely the 4D train's last run, from Newport to Simsmetal at Brooklyn. El Zorro's Y168 and W241 took the 4D away, with a small number of other freight wagons for braking purposes.

X'Trapolis transfer, October 2005

25 October 2005

The Connex X'Trapolis EMU fleet required a number of modifications that were carried out at the Ballarat Workshops. Set 925M-1663T-926M + 919M-1660T-920M was transferred from Ballarat to Bayswater (via Geelong) with T377 as the motive power, with power van ZVDY 52 attached to the rear

Metro Trains Melbourne

Metro Trains Melbourne has been the operator of the Melbourne suburban rail network since November 2009.