Wongm's Rail Gallery » Qube Logistics works trains

VL360 at the up end of a spoil train at the Metro Infrastructure Siding at Paisley

In album: Qube Logistics works trains

VL360 at the up end of a spoil train at the Metro Infrastructure Siding at Paisley

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Thursday 5 April 2018 11:18 AM
Exposure Time: 1/320 sec
Aperture Value: f/11
Viewed 646 times
(1 time this week, 1 time this month, 37 times this year)