Wongm's Rail Gallery » Reservoir level crossing removal project

Piling work underway at the northern end of the future viaduct

In album: Reservoir level crossing removal project

Piling work underway at the northern end of the future viaduct

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Sunday 1 September 2019 16:45 PM
Exposure Time: 1/500 sec
Aperture Value: f/13
Viewed 433 times
(1 time this week, 1 time this month, 24 times this year)