Wongm's Rail Gallery » Reservoir level crossing removal project

Piling work underway at the northern end of the future viaduct

In album: Reservoir level crossing removal project

Piling work underway at the northern end of the future viaduct

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 1 September 2019 16:45 PM
Exposure Time: 1/400 sec
Aperture Value: f/13
Viewed 434 times
(1 time this week, 2 times this month, 14 times this year)