Wongm's Rail Gallery » Seaford Road level crossing removal project

Seaford Road level crossing removal project

The level crossing on the Frankston line at Seaford Road in Seaford will be removed, replaced by an rail over road bridge.

Metro Trains maintenance staff have taken over the site compound at R F Miles Reserve

24 December 2019 14:18 PM
Viewed 49 times
(5 times this week, 8 times this month, 49 times this year)

Twin single track bridges over Seaford Road

11 August 2019 14:58 PM
Viewed 91 times
(1 time this week, 11 times this month, 91 times this year)

Beneath the twin single track bridges over Seaford Road

11 August 2019 14:57 PM
Viewed 87 times
(1 time this week, 11 times this month, 87 times this year)

'Electrify trains and move stabling to Baxter' poster on a house on Seaford Road

11 August 2019 14:56 PM
Viewed 120 times
(2 times this week, 7 times this month, 120 times this year)

Final landscaping to be competed at the R F Miles Reserve in Seaford

11 August 2019 14:56 PM
Viewed 277 times
(4 times this week, 23 times this month, 277 times this year)

Completed bridge over the floodway at the up end

11 August 2019 14:55 PM
Viewed 111 times
(1 time this week, 8 times this month, 111 times this year)

Final cleanup at the R F Miles Reserve in Seaford

11 August 2019 14:55 PM
Viewed 154 times
(2 times this week, 13 times this month, 154 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 17:27 PM
Viewed 395 times
(5 times this week, 13 times this month, 121 times this year)

Pair of single track bridges over a floodway at the up end of Seaford Road

26 August 2018 17:26 PM
Viewed 274 times
(1 time this week, 10 times this month, 94 times this year)

Pair of single track bridges over a floodway at the up end of Seaford Road

26 August 2018 17:26 PM
Viewed 882 times
(5 times this week, 18 times this month, 189 times this year)

Future bridge in place over Seaford Road, with the low level track still to be removed

The road will also need to be lowed, to provide enough clearance under the bridge for roads vehicles

26 August 2018 17:26 PM
Viewed 350 times
(2 times this week, 10 times this month, 92 times this year)

Temporary retaining wall on the west side of the future elevated tracks over Seaford Road

When the new tracks are ready to be commissioned, the lower level tracks will be moved and the embankment will be widened

26 August 2018 17:26 PM
Viewed 356 times
(4 times this week, 11 times this month, 149 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 17:26 PM
Viewed 277 times
(2 times this week, 8 times this month, 94 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 370 times
(2 times this week, 14 times this month, 182 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 202 times
(3 times this week, 12 times this month, 70 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 216 times
(1 time this week, 14 times this month, 94 times this year)

Tall timber fence in an attempt to protect neighbouring residents from rail noise from the temporary track slew at Seaford

26 August 2018 14:38 PM
Viewed 322 times
(4 times this week, 13 times this month, 163 times this year)

Building new fences lineside at the down end of Seaford Road

12 April 2018 13:31 PM
Viewed 234 times
(1 time this week, 2 times this month, 29 times this year)

Relocating signalling cables at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 237 times
(1 time this week, 3 times this month, 16 times this year)

Relocating signalling cables at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 215 times
(2 times this week, 3 times this month, 18 times this year)

Clearing the alignment of the temporary track slew at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 262 times
(1 time this week, 2 times this month, 22 times this year)

Clearing the alignment of the temporary track slew at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 428 times
(1 time this week, 2 times this month, 20 times this year)

Clearing the alignment of the temporary track slew at the down end of Seaford Road

12 April 2018 12:33 PM
Viewed 294 times
(1 time this week, 2 times this month, 18 times this year)

Building new fences lineside at the down end of Seaford Road

12 April 2018 12:33 PM
Viewed 211 times
(4 times this month, 19 times this year)