Wongm's Rail Gallery » Seaford Road level crossing removal project

Seaford Road level crossing removal project

The level crossing on the Frankston line at Seaford Road in Seaford will be removed, replaced by an rail over road bridge.

Twin single track bridges over Seaford Road

11 August 2019 14:58 PM
Viewed 13 times
(13 times this month, 13 times this year)

Beneath the twin single track bridges over Seaford Road

11 August 2019 14:57 PM
Viewed 8 times
(8 times this month, 8 times this year)

'Electrify trains and move stabling to Baxter' poster on a house on Seaford Road

11 August 2019 14:56 PM
Viewed 15 times
(15 times this month, 15 times this year)

Final landscaping to be competed at the R F Miles Reserve in Seaford

11 August 2019 14:56 PM
Viewed 16 times
(16 times this month, 16 times this year)

Completed bridge over the floodway at the up end

11 August 2019 14:55 PM
Viewed 17 times
(17 times this month, 17 times this year)

Final cleanup at the R F Miles Reserve in Seaford

11 August 2019 14:55 PM
Viewed 15 times
(15 times this month, 15 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 17:27 PM
Viewed 270 times
(1 time this week, 4 times this month, 270 times this year)

Pair of single track bridges over a floodway at the up end of Seaford Road

26 August 2018 17:26 PM
Viewed 176 times
(1 time this week, 2 times this month, 176 times this year)

Pair of single track bridges over a floodway at the up end of Seaford Road

26 August 2018 17:26 PM
Viewed 681 times
(5 times this month, 681 times this year)

Future bridge in place over Seaford Road, with the low level track still to be removed

The road will also need to be lowed, to provide enough clearance under the bridge for roads vehicles

26 August 2018 17:26 PM
Viewed 250 times
(1 time this month, 250 times this year)

Temporary retaining wall on the west side of the future elevated tracks over Seaford Road

When the new tracks are ready to be commissioned, the lower level tracks will be moved and the embankment will be widened

26 August 2018 17:26 PM
Viewed 198 times
(5 times this month, 198 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 17:26 PM
Viewed 177 times
(2 times this month, 177 times this year)

Clearing beside the tracks at Kananook, for the future stabling yard headshunt

26 August 2018 17:25 PM
Viewed 210 times
(1 time this month, 210 times this year)

Clearing beside the tracks at Kananook, for the future stabling yard headshunt

26 August 2018 14:39 PM
Viewed 218 times
(2 times this month, 218 times this year)

Clearing beside the tracks at Kananook, for the future stabling yard headshunt

26 August 2018 14:39 PM
Viewed 126 times, 126 times this year)

Clearing beside the tracks at Kananook, for the future stabling yard headshunt

26 August 2018 14:39 PM
Viewed 139 times, 139 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 180 times
(5 times this month, 180 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 122 times
(1 time this month, 122 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 113 times
(1 time this month, 113 times this year)

Tall timber fence in an attempt to protect neighbouring residents from rail noise from the temporary track slew at Seaford

26 August 2018 14:38 PM
Viewed 152 times
(1 time this week, 4 times this month, 152 times this year)

Building new fences lineside at the down end of Seaford Road

12 April 2018 13:31 PM
Viewed 143 times
(3 times this week, 10 times this month, 32 times this year)

Relocating signalling cables at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 160 times
(7 times this month, 29 times this year)

Relocating signalling cables at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 138 times
(7 times this month, 28 times this year)

Clearing the alignment of the temporary track slew at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 172 times
(8 times this month, 40 times this year)
Tags

Viewed 731 times (24 times this week, 55 times this month, 161 times this year)