Wongm's Rail Gallery » Seaford Road level crossing removal project

Seaford Road level crossing removal project

The level crossing on the Frankston line at Seaford Road in Seaford will be removed, replaced by an rail over road bridge.

Twin single track bridges over Seaford Road

11 August 2019 14:58 PM
Viewed 33 times, 33 times this year)

Beneath the twin single track bridges over Seaford Road

11 August 2019 14:57 PM
Viewed 26 times
(1 time this month, 26 times this year)

'Electrify trains and move stabling to Baxter' poster on a house on Seaford Road

11 August 2019 14:56 PM
Viewed 36 times, 36 times this year)

Final landscaping to be competed at the R F Miles Reserve in Seaford

11 August 2019 14:56 PM
Viewed 39 times
(1 time this month, 39 times this year)

Completed bridge over the floodway at the up end

11 August 2019 14:55 PM
Viewed 36 times, 36 times this year)

Final cleanup at the R F Miles Reserve in Seaford

11 August 2019 14:55 PM
Viewed 36 times, 36 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 17:27 PM
Viewed 289 times
(1 time this week, 2 times this month, 15 times this year)

Pair of single track bridges over a floodway at the up end of Seaford Road

26 August 2018 17:26 PM
Viewed 194 times
(1 time this week, 2 times this month, 14 times this year)

Pair of single track bridges over a floodway at the up end of Seaford Road

26 August 2018 17:26 PM
Viewed 716 times
(3 times this week, 5 times this month, 23 times this year)

Future bridge in place over Seaford Road, with the low level track still to be removed

The road will also need to be lowed, to provide enough clearance under the bridge for roads vehicles

26 August 2018 17:26 PM
Viewed 269 times
(1 time this month, 11 times this year)

Temporary retaining wall on the west side of the future elevated tracks over Seaford Road

When the new tracks are ready to be commissioned, the lower level tracks will be moved and the embankment will be widened

26 August 2018 17:26 PM
Viewed 235 times
(1 time this month, 28 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 17:26 PM
Viewed 198 times
(1 time this week, 4 times this month, 15 times this year)

Clearing beside the tracks at Kananook, for the future stabling yard headshunt

26 August 2018 17:25 PM
Viewed 257 times
(1 time this week, 6 times this month, 38 times this year)

Clearing beside the tracks at Kananook, for the future stabling yard headshunt

26 August 2018 14:39 PM
Viewed 233 times
(1 time this week, 2 times this month, 11 times this year)

Clearing beside the tracks at Kananook, for the future stabling yard headshunt

26 August 2018 14:39 PM
Viewed 141 times
(3 times this month, 9 times this year)

Clearing beside the tracks at Kananook, for the future stabling yard headshunt

26 August 2018 14:39 PM
Viewed 156 times
(1 time this week, 2 times this month, 12 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 241 times
(2 times this week, 6 times this month, 53 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 139 times
(2 times this month, 7 times this year)

Track laying underway for the future elevated tracks over Seaford Road

26 August 2018 14:38 PM
Viewed 131 times
(2 times this month, 9 times this year)

Tall timber fence in an attempt to protect neighbouring residents from rail noise from the temporary track slew at Seaford

26 August 2018 14:38 PM
Viewed 210 times
(2 times this week, 3 times this month, 51 times this year)

Building new fences lineside at the down end of Seaford Road

12 April 2018 13:31 PM
Viewed 160 times
(3 times this month, 49 times this year)

Relocating signalling cables at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 177 times
(5 times this month, 46 times this year)

Relocating signalling cables at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 156 times
(1 time this month, 46 times this year)

Clearing the alignment of the temporary track slew at the down end of Seaford Road

12 April 2018 12:34 PM
Viewed 194 times
(5 times this month, 62 times this year)
Tags

Viewed 869 times (1 time this week, 45 times this month, 299 times this year)