Wongm's Rail Gallery » Seaford Road level crossing removal project

Track laying underway for the future elevated tracks over Seaford Road

In album: Seaford Road level crossing removal project

Track laying underway for the future elevated tracks over Seaford Road

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 26 August 2018 17:26 PM
Exposure Time: 1/800 sec
Aperture Value: f/6.3
Viewed 397 times
(2 times this week, 1 time this month, 102 times this year)