Wongm's Rail Gallery » Melbourne signals and signalling equipment

Three sets of trainstops for signal HDB 144 at Heidelberg

In album: Melbourne signals and signalling equipment

The signal prevents trains from entering the single track section towards the Heidelberg Tunnel, and two speed proving trainstops prevent trains from overshooting the signal at stop

Three sets of trainstops for signal HDB 144 at Heidelberg

View full sized (1024px by 683px)

Taken with a Canon EOS 50D
Date: Saturday 28 April 2012 15:28 PM
Exposure Time: 1/250 sec
Aperture Value: f/7.1
Viewed 1433 times
(1 time this week, 4 times this month, 4 times this year)