Wongm's Rail Gallery » Furlong Main level crossing removal project

Signalling cable relocation works in preparation for the Main Road grade separation works at St Albans

In album: Furlong Main level crossing removal project

Signalling cable relocation works in preparation for the Main Road grade separation works at St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 20 March 2015 08:28 AM
Exposure Time: 1/500 sec
Aperture Value: f/7.1
Viewed 767 times
(4 times this week, 7 times this month, 75 times this year)