Wongm's Rail Gallery » Furlong Main level crossing removal project

SPOT monitor at the up end of St Albans platform 3 still powered up, despite the lack of track

In album: Furlong Main level crossing removal project

SPOT monitor at the up end of St Albans platform 3 still powered up, despite the lack of track

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Saturday 12 September 2015 22:52 PM
Exposure Time: 1/30 sec
Aperture Value: f/4
Viewed 797 times
(1 time this week, 1 time this month, 1 time this year)