Wongm's Rail Gallery » Furlong Main level crossing removal project

Completed piling work along the western side of the existing rail corridor

In album: Furlong Main level crossing removal project

Completed piling work along the western side of the existing rail corridor

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 6 November 2015 08:35 AM
Exposure Time: 1/160 sec
Aperture Value: f/9
Viewed 637 times
(1 time this week, 1 time this month, 100 times this year)