Wongm's Rail Gallery » Furlong Main level crossing removal project

Work on a token pedestrian bridge over the trench at the down end of Main Road

In album: Furlong Main level crossing removal project

The new low level station will be almost as divisive as the ground level railway it is replacing
Work on a token pedestrian bridge over the trench at the down end of Main Road

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Thursday 10 March 2016 14:52 PM
Exposure Time: 1/400 sec
Aperture Value: f/14
Viewed 769 times
(1 time this week, 1 time this month, 1 time this year)