Wongm's Rail Gallery » Furlong Main level crossing removal project

Retaining walls and the Main Road bridge completed, but the trench is yet to be dug either side

In album: Furlong Main level crossing removal project

Retaining walls and the Main Road bridge completed, but the trench is yet to be dug either side

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 10 March 2016 15:31 PM
Exposure Time: 1/800 sec
Aperture Value: f/7.1
Viewed 742 times
(2 times this week, 2 times this month, 50 times this year)
1 vote from 1 view