Wongm's Rail Gallery » Furlong Main level crossing removal project

Soil nailing works in the rial cutting at the down end of Ginifer station

In album: Furlong Main level crossing removal project

Soil nailing works in the rial cutting at the down end of Ginifer station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 16 August 2016 08:40 AM
Exposure Time: 1/125 sec
Aperture Value: f/8
Viewed 481 times
(5 times this week, 7 times this month, 61 times this year)