Wongm's Rail Gallery » Furlong Main level crossing removal project

Tip truck arrives at the Ginifer railway cutting site for a another load of spoil

In album: Furlong Main level crossing removal project

Tip truck arrives at the Ginifer railway cutting site for a another load of spoil

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 24 August 2016 08:53 AM
Exposure Time: 1/8000 sec
Aperture Value: f/4
Viewed 346 times
(1 time this week, 7 times this month, 43 times this year)