Wongm's Rail Gallery » Furlong Main level crossing removal project

Shotcreted cutting walls at the up end of Ginifer station

In album: Furlong Main level crossing removal project

Shotcreted cutting walls at the up end of Ginifer station

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 29 September 2016 07:36 AM
Exposure Time: 1/400 sec
Aperture Value: f/5.6
Viewed 467 times
(3 times this week, 3 times this month, 52 times this year)