Wongm's Rail Gallery » Furlong Main level crossing removal project

Excavator breaking up rock in the cutting at the up end of Ginifer station

In album: Furlong Main level crossing removal project

Excavator breaking up rock in the cutting at the up end of Ginifer station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 29 September 2016 07:36 AM
Exposure Time: 1/500 sec
Aperture Value: f/5.6
Viewed 436 times
(2 times this week, 2 times this month, 56 times this year)