Wongm's Rail Gallery » Furlong Main level crossing removal project

Excavator breaking up rock in the cutting at the up end of Ginifer station

In album: Furlong Main level crossing removal project

Excavator breaking up rock in the cutting at the up end of Ginifer station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Thursday 29 September 2016 07:36 AM
Exposure Time: 1/500 sec
Aperture Value: f/5.6
Viewed 571 times
(1 time this week, 1 time this month, 1 time this year)